Start Early

Winter Is Planning Season

When the ground is frozen or snow-covered, most outdoor construction slows down, but planning does not have to. Winter is a good window to decide what you want built, understand what it involves, and line up the right people. Homeowners who plan early tend to have fewer surprises when the weather turns and contractor calendars fill.

Step one: define what you want

Write down the project in plain language. Is it a new septic system, a drainage fix, a driveway, a garage, a deck, a kitchen remodel, or a home addition? List must-haves and nice-to-haves, and take photos of the area from several angles. If you are not sure what the right solution is, that is fine. A good contractor can help you figure out the options, but the clearer your goals, the better the conversation will be.

Step two: understand the site and the rules

Many projects depend on conditions you can check in winter. Walk the property and note drainage, slope, access, and existing utilities. Find out which permits are likely to apply and who issues them, since requirements and timing vary by project and location. For septic projects, our septic installation process guide outlines the typical steps, and for buildable land questions, see our land evaluation checklist.

Step three: gather information for estimates

When you ask for estimates, give each contractor the same information so the quotes are easy to compare: a description of the work, photos, rough dimensions, any plans or sketches, your target timeline, and your budget range if you are comfortable sharing it. Ask each one what is included, what is not, and what could change the price. Our guide to choosing a general contractor in rural NC has questions worth asking.

Step four: match the project to the season

Some work is more affected by weather than others. Excavation, grading, concrete, and septic installation depend on ground and temperature conditions, while interior remodeling can proceed all winter. If you are considering an interior project like a kitchen remodel, it may be a good fit for winter, while exterior work like decks and additions is often scheduled for spring and summer. Ask your contractor which parts of your project can start now and which should wait.

Step five: leave room in the schedule

Wet spring ground, permit and inspection timing, material delivery, and busy schedules can all push a start date back. Build some flexibility into your plans, especially if the project has a firm deadline such as a family event or a move-in date. Planning early also gives you time to think through the details of a larger job such as a home addition before the building season begins.

Talk to a local, licensed contractor

Riverfront Group is a licensed general contractor serving Ashe, Alleghany, Avery, Watauga, and Wilkes counties. If you are thinking about a spring project, we are glad to talk through your goals and the site, and to help you work out what to do first.

Excavator preparing a mountain building site
Work With Adam

Thinking about a project for spring?

Call Adam to talk through your goals and the best time to start.